Courses » JAMB » JAMB Mathematics » Mathematics Exam Topics » 1991 - Questions and Answers

1991 - JAMB Mathematics Past Questions and Answers - page 1

1
PMN and PQR are two secants of the circle MQTRN and PT is a tangent. If PNR = 110o and PMQ = 55o, find MPQ
A
40o
B
30o
C
25o
D
15o
Ask EduPadi AI for a Detailed Answer
2
In the figure above, find the value of y
A
28o
B
122o
C
150o
D
152o
Ask EduPadi AI for a Detailed Answer
3
In this figure, PQ = PR = PS and SRT = 68o. Find QPS
A
136o
B
124o
C
12o
D
68o
Ask EduPadi AI for a Detailed Answer
4
In the figure, PQRS is a square of sides 8cm. What is the area of UVW?
A
64 sq. cm
B
40 sq.cm
C
50 sq.cm
D
10 sq.cm
Ask EduPadi AI for a Detailed Answer
5
Find the volume of the figure
A
aπ23(x+3y)
B
aπ2y
C
aπ23(y + x)
D
(13aπ2x+y)
Ask EduPadi AI for a Detailed Answer
6

Simplify 3(\frac{1}{3}) - 1(\frac{1}{4}) x (\frac{2}{3}) + 1(\frac{2}{5})

A
2
B
3
C
4
D
5
Ask EduPadi AI for a Detailed Answer
7

If 2257 is the result of subtracting 4577 from 7056 in base n, find n

A
81730
B
9910
C
10110
D
111136
Ask EduPadi AI for a Detailed Answer
8

Find correct to 3 decimal places ((\frac{1}{0.05}) + (\frac{1}{5.005})) - (0.05 x 2.05)

A
99.998
B
98.999
C
89.899
D
9.998
Ask EduPadi AI for a Detailed Answer
9

express 62 (\div) 3 as a decimal correct to 3 significant figures

A
20.6
B
20.667
C
20.67
D
20.7
Ask EduPadi AI for a Detailed Answer
10

Factory P produces 20,000 bags of cement per day while factory Q produces 15,000 bags per day. If P reduces production by 5% and Q increases production by 5%, determine the effective loss in the number of bags produced per day by the two factories

A
250
B
750
C
1000
D
1250
Ask EduPadi AI for a Detailed Answer
Please share this, thanks: